MITIGATION MEASUREs



The toolbox includes approximately 70 structural mitigation measures. The structural measures are divided into ten categories and belong to class of measures either reducing hazard or reducing consequences



1.1: Hydroseeding

Category 1 : NBS FOR EROSION CONTROL - Living approach / NBS for erosjonsreduksjon - levende materialer
0 Comments

1.2: Turfing

Category 1 : NBS FOR EROSION CONTROL - Living approach / NBS for erosjonsreduksjon - levende materialer
0 Comments

1.3: Tree bushes direct/pit planting (Live transplanting)

Category 1 : NBS FOR EROSION CONTROL - Living approach / NBS for erosjonsreduksjon - levende materialer
0 Comments

1.4: Live/inert fascines and straw wattles

Category 1 : NBS FOR EROSION CONTROL - Living approach / NBS for erosjonsreduksjon - levende materialer
0 Comments

1.5: Brush mattresses

Category 1 : NBS FOR EROSION CONTROL - Living approach / NBS for erosjonsreduksjon - levende materialer
0 Comments

1.6: Brush layering

Category 1 : NBS FOR EROSION CONTROL - Living approach / NBS for erosjonsreduksjon - levende materialer
0 Comments

1.7: Live stakes (Live poles)

Category 1 : NBS FOR EROSION CONTROL - Living approach / NBS for erosjonsreduksjon - levende materialer
0 Comments

1.8: Live smiles

Category 1 : NBS FOR EROSION CONTROL - Living approach / NBS for erosjonsreduksjon - levende materialer
0 Comments

2.1: Geotextiles (Rolled erosion control products)

Category 2 : NBS FOR EROSION CONTROL - Combined living/not living approach / NBS for erosjonsreduksjon - kombinerte levende/ikke levende materialer
0 Comments

2.2: Drainage blankets

Category 2 : NBS FOR EROSION CONTROL - Combined living/not living approach / NBS for erosjonsreduksjon - kombinerte levende/ikke levende materialer
0 Comments

2.3: Beach replenishment/nourishment

Category 2 : NBS FOR EROSION CONTROL - Combined living/not living approach / NBS for erosjonsreduksjon - kombinerte levende/ikke levende materialer
0 Comments

2.4: Rip-rap

Category 2 : NBS FOR EROSION CONTROL - Combined living/not living approach / NBS for erosjonsreduksjon - kombinerte levende/ikke levende materialer
0 Comments

2.5: Rock dentition

Category 2 : NBS FOR EROSION CONTROL - Combined living/not living approach / NBS for erosjonsreduksjon - kombinerte levende/ikke levende materialer
0 Comments

3.1: Removal of (actual or potentially) unstable soil/rock mass

Category 3 : MODIFYING THE SLOPE GEOMETRY - mass distribution
0 Comments

3.2: Removal of loose or potentially unstable blocks/boulders (trimming and scaling)

Category 3 : MODIFYING THE SLOPE GEOMETRY - mass distribution
0 Comments

3.3: Removal of material from driving area

Category 3 : MODIFYING THE SLOPE GEOMETRY - mass distribution
0 Comments

3.4: Substitution of material in driving area with light weight fill

Category 3 : MODIFYING THE SLOPE GEOMETRY - mass distribution
0 Comments

3.5: Addition of material to the area maintaining stability

Category 3 : MODIFYING THE SLOPE GEOMETRY - mass distribution
0 Comments

3.6: Terracing (NBS)

Category 3 : MODIFYING THE SLOPE GEOMETRY - mass distribution
0 Comments

4.1: Surface drainage works (Ditches, Channels, Pipeworks)

Category 4 : MODIFYING THE SURFACE WATER REGIME – Surface drainage
0 Comments

4.2: Local regrading to facilitate runoff

Category 4 : MODIFYING THE SURFACE WATER REGIME – Surface drainage
0 Comments

4.3: Sealing tension cracks

Category 4 : MODIFYING THE SURFACE WATER REGIME – Surface drainage
0 Comments

4.4: Impermeabilization (Geo Membranes, Impervious facing)

Category 4 : MODIFYING THE SURFACE WATER REGIME – Surface drainage
0 Comments

4.5: Vegetation - Hydrological effects (NBS)

Category 4 : MODIFYING THE SURFACE WATER REGIME – Surface drainage
0 Comments

4.6: Hydraulic Control Works (Channel Lining and Check Dams)

Category 4 : MODIFYING THE SURFACE WATER REGIME – Surface drainage
0 Comments

4.7: Diversion channels

Category 4 : MODIFYING THE SURFACE WATER REGIME – Surface drainage
0 Comments

4.8: Live pole drains (NBS)

Category 4 : MODIFYING THE SURFACE WATER REGIME – Surface drainage
0 Comments

4.9: Live/rock check dams (NBS)

Category 4 : MODIFYING THE SURFACE WATER REGIME – Surface drainage
0 Comments

5.1: Shallow trenches filled with free-draining material

Category 5 : MODIFYING THE GROUNDWATER REGIME – Deep drainage
0 Comments

5.2: Deep trenches filled with free-draining material

Category 5 : MODIFYING THE GROUNDWATER REGIME – Deep drainage
0 Comments

  • «
  • 1 (current)
  • 2
  • 3
  • »